HZ-6300C Transformer Capacity & Loss Tester

HZ-6300C Transformer Capacity & Loss Tester

HZ-6300C Transformer Capacity & Loss Tester I. Introduction Transformer Capacity Testing Instrument is specialized in bad power users evading basic electricity secretly adds capacity problems and is a high precision instrument specially used for the measurement of the transformer capacity...

 

Huazheng Electric HZ-6300C Transformer Capacity & Loss Tester

 

 

 

 

I.

Transformer Capacity Testing Instrument is specialized in bad power users evading basic electricity secretly adds capacity problems and is a high precision instrument specially used for the measurement of the transformer capacity and parameters. This product uses color LCD monitor, English display, simple and quick menu operation, man-machine interface is friendly. The internal of the instrument has a rechargeable battery and it can work without external power source. A fully charged battery can be continuously measured more than 100 sets. In addition, the instrument can provide three-phase precise 50Hz sine wave AC test power without the external three-phase test power, the pressure regulator, up flow reactor and other auxiliary equipment in measuring the capacity and transformer load loss, thus greatly improving the efficiency of the work.

HZ-6300C01

HZ-6300C02

HZ-6300C03

.

1. The output range of built-in battery

Voltage:0-10V

Current:0-10A

2. The output range of characteristic test battery

Voltage:0-750V

Current:0-100A

3. Accurate

Voltage, current:±0.2%

Power:±0.5%(CosΦ>0.1), ±1.0%(0.02

6.3~125,000 KVA.

-20 degree -+60 degree

6. The requirement of charger

Electric supply AC160V-265V

7. Insulation

⑴ Insulation resistance between capacity , voltage, current and cover Greater than or equal to 100MΩ

⑵ Power frequency is 2KV(effective value) between the input power and cover, testing time is 1 minute.

8. Volume

32cm×25cm×12cm

9. Weight

2.5KGS

 

1,The connecting method of testing line should operate according to instruction, otherwise it will affect the result

2, The wiring should be proceeded when the testing line has grounded in order to electric shock of induced voltage.

3, Please ensure the voltage ,current under the testing range. It need to connect with CT PT to expand the range , or testing result will not right.

4,When instrument do capacity test, active load test, load test,

Please ensure the short circuit of the no-pressure side, otherwise it will affect the result.

 

1

1

2

1

3

2

4

1

5

1

 

 

 

1. When can I get a price quote?

You can contact us online or submit an inquiry. We typically provide a quote within 24 hours after receiving your request.

 

2. How do you handle after-sale service for overseas customers?

12-month warranty coverage (see details below).

On-site support (if required): Our engineers can travel abroad to resolve critical issues.

IMG20241121162722

3. What is the warranty period?

Our standard warranty period is 12 months (1 year). During this time, we provide:

 

 

HZ-20A04

 

 

af7e9172c2e3db1e6c4b786d81dd1ea7

 

 

Manufacturing-Price-Portable-Automatic-Current-Transformer-CT-PT-Testing-System 1

 

 

 

 

product-750-1077

 

 

 

 

 

 

 

Baj popilè: hz-6300c transformer capacity & loss tester, China hz-6300c transformer capacity & loss tester manufacturers, suppliers, factory

Voye rechèch

(0/10)

clearall